PI - Subsea Engineering - Front End Engineering Design (FEED)

During this phase of the project the emphasis is not only on fixing the system design in accordance with the relevant codes but also looking forward to procurement (LLI) and authority applications (PWA) as well as the detailed design and construction phases.

Back to Subsea Engineering >